GENERAL MACC GUIDE SPECIFICATIONS
| GENERAL MACC CONTRACTS | |
| N40085-07-D-1908 AND N40085-10-D-0259 | |
| NORTH CAROLINA AREA | |
| GUIDE SPECIFICATIONS |
| AMENDMENT 0003 revised specification section 01 35 29 Para 1.3 - definitions: | AWARDED PROJECTS/MACC GUIDE SPECIFICATIONS/P0003 03092011.pdf |
| AMENDMENT 0002 revised section 02 82 16 Removal/Disposal of asbestos containing materials: | AWARDED PROJECTS/MACC GUIDE SPECIFICATIONS/MOD 100259 P00002.pdf |
| AMENDMENT 0001 compliance
with FAR 52.204-10 - Reporting Executive Compensation and First-Tier
Subcontract Awards - required and must be acknowledged on all bids and will
be a requirement on all awards.
For additional information see www.fsrs.gov
compliance with FAR 52.222-54 Employment Verification required for all awards. For additional information see www.dhs.gov/E-Verify
This amendment also includes Wage Determinations for Onslow and Craven Counties |
AWARDED PROJECTS/MACC GUIDE SPECIFICATIONS/P00001 100259.pdf |
| DIVISION 1 THRU DIVISION 12 | AWARDED PROJECTS/MACC GUIDE SPECIFICATIONS/DIV 1 THRU DIV 12.pdf |
| DIVISION 21 FIRE SUPPRESSION | AWARDED PROJECTS/MACC GUIDE SPECIFICATIONS/GUIDE SPECIFICATION DIV 21 FIRE SUPPRESSION .pdf |
| DIVISION 22 PLUMBING
AND DIVISION 23 BASIC MECHANICAL MATERIALS AND METHODS to include HVAC, Testing and Balancing, Controls and Insulation |
AWARDED PROJECTS/MACC GUIDE SPECIFICATIONS/GUIDE SPECS PLUMBING AND BASIC MECHANICALpdf.pdf |
| DIVISION 26 BASIC ELECTRIC,
DIVISION 27 BUILDING TELECOM CABLING SYSTEM
AND DIVISION 28 FIRE ALARMS |
AWARDED PROJECTS/MACC GUIDE SPECIFICATIONS/GUIDE SPECS ELECTRICAL, TELECON, FIRE ALARMS.pdf |
| DIVISION 31 EARTHWORK, DIVISION 32 EXTERIOR IMPROVEMENTS, DIVISION 33 UTILITIES, DIVISION 41 AUTOMATIC PUMP CONTROLS | AWARDED PROJECTS/MACC GUIDE SPECIFICATIONS/GUIDE SPECIFICATIONS DIV 31 32 33 41.pdf |
These files are in Adobe Acrobat PDF format.