AWARDED PROJECT
| Project Title: | ELEVATED TANK REPAIRS, PHASE I, AS310, AS2010, AS4130, ETC. |
| Project Location: | MCB CAMP LEJEUNE, NC |
| Contract Number/Solicitation / Project No.: | N40085-10-D-0259/0011 10-0208 GM26 360 DAYS = December 11, 2012 $200/day LD's |
| Program: | GENERAL MACC |
| Special scheduling requirements: |
1. the areas will remain in operation during the
entire construction period. The contractor shall conduct his
operations as to cause the least possible interference with normal
operations of the activity
2. permission to interrupt any station roads, railroads, and/or utility service shall be requested in writing a minimum of 15 calendar days prior to the desired date of interruption |
| DRAWINGS: | PLANROOM/GM26_ELEVATED_TANK_REPAIRS_PHASE I/Dwgs_100208.pdf |
| SPECIFICATIONS; | PLANROOM/GM26_ELEVATED_TANK_REPAIRS_PHASE I/Spec_100208.pdf |
| AMENDMENT 01 answered RFI's: | PLANROOM/GM26_ELEVATED_TANK_REPAIRS_PHASE I/Amend 0001 100208.pdf |
| AMENDMENT 02 ANSWERED RFI'S: | PLANROOM/GM26_ELEVATED_TANK_REPAIRS_PHASE I/Amend 0002 100208.pdf |
| AMENDMENT 03 ANSWERED RFI: | PLANROOM/GM26_ELEVATED_TANK_REPAIRS_PHASE I/Amend 0003 100208.pdf |
These files are in Adobe Acrobat PDF format.