AWARDED PROJECT


Project Title:   REPAIR INTERIOR B4322
Project Location:    MCAS CHERRY POINT
Contract Number / Project No.:   N40085-07-D-1908/0123   4699623  #331  

CCD=90 DAYS= 13 APRIL 2010    $200/DAY LD'S 

Program:   GMACC  

DRAWINGS: NONE
SCOPE OF WORK: PLANROOM/331 INT REPAIRS B4322 CP SB/SCOPE OF WORK B4322.pdf
AMENDMENT 0001 CHANGED CONTRACT TIME PLANROOM/331 INT REPAIRS B4322 CP SB/Amendment 0001.pdf
ANSWERED RFI: Question: It is our understanding that the Mechanical Engineering Group at Cherry Point has decided to only use 0.0 ozone depleting refrigerants as of 2009.  The existing units are R22, which does not meet that requirement.  Should we replace the R22 units with 410A (0.00 ozone depleting characteristic) refrigerant units?

FYI, as of Jan 1st 2010, no manufacturer will be allowed to manufacture an
R22 machine.  
Answer: The contractor is required to use equipment with Refrigerant 410-a.
  