AWARDED PROJECT
| Project Title: | REPAIR B-298 |
| Project Location: | MCAS CHERRY POINT, NC |
| Contract Number / Project No.: | N40085-07-D-1908/0122 CP0829M #358
CCD=360 DAYS= 12/12/2010 LD'S = $1650/DAY |
| Program: |
GMACC
|
| DRAWINGS: | FINAL DRAWINGS.pdf |
| SPECIFICATIONS: | PLANROOM/358 REPAIR B-298 CP/SPECS B-298 Repair.pdf |
| AMENDMENT 0001 CLARIFICATIONS: | PLANROOM/358 REPAIR B-298 CP/Amendment 0001.pdf |
| ANSWERED RFI: | Question: In the
Spec section 01 35 29 pg 6 paragraph 1.6.1.1 it states The Contractor
Quality Control person can be the SSHO on this project. Then in Spec
section 01 45 00.00 20 pg 5 paragraph 1.5.1.1 it states the QC Manager may
perform the duties of the Project Superintendent. Then goes on the state
That QC Manager shall not be designated as the safety competent person as
defined be EM 385-1-1. Which is correct? If duly qualified can 1
person perform all 3 positions? Answer:Yes, the intent was that if duly qualified, one person could serve in all 3 positions. |
| ANSWERED RFI: |
Questions:1. Section 099000 calls for under
Main Heading Painting of new and existing, interior and exterior substrates, including masonry, concrete, metal, wood and other miscellaneous materials Do we follow finish schedule on plans or this directive? 2. If we follow the Finish Schedule, who is responsible for damage to walls, doors, etc from installation of Mechanical, Electrical, and new ACT Ceiling in other areas of the project? 3. Does the exterior wood ramp and rails of the Modular unit required painting? Answers:1. Follow the
finish schedule on plans. The only areas requiring painting are the
library walls, the walls of the bathrooms being renovated, and the interior
of the modular building. |
| Answered RFI: |
Question: According
to drawing AD101 the library ceiling is to be "demolished of existing metal lath & plaster ceiling and lights.". Drawing ED102 and ED103 Note 1 says "Remove all ceiling light fixtures in this area including conduit and wire back to panel board circuit breakers. Drawing E-102 Note 7 "During ceiling removal hang ceiling speakers, lighting fixtures, and smoke detectors from overhead structure. Install in new ceiling." Are we to reinstall the existing fixtures in the new lay in ceiling? Answer: Construction Note 7 on sheet
E-102 is incorrect. This area is to receive new light fixtures. |
| Answered RFI - mechanical: |
Question: There is a scheduling note on the
drawings that states there will be no heating demo/work in the facility
during the heating season, and that all work is to be done between April 15
and October 15. Will this be adhered to, thus pushing all work to be started
April 15, 2010, or is this an outdated note? There is a section in the
specifications under the scheduling section as well. Any information that
you may have on this issue will be greatly appreciated.
Answer: The
note is correct. There is to be no heating demo/work between Oct 15
and Apr 15. However, all other work in the project can be done at any
time throughout the year. |
| Answered RFI: |
1. On Sheet 11, AD102, Demo notes, item #20 of the drawings,
does this flooring get replaced and if so with what?
Response: Please see A-101 plan view
2. As stated in the Interior Finish Schedule on A-501, room 106 gets
ceramic tile floor and wall base and room 107 will be concrete with no wall
base. Response: There
is no specific carpet tile in mind. The tile carpet is for the high
traffic areas. |
| ANSWERED RFI: |
Question: Spec section 23 82 00.00 20 para
2.1.1.2 Coil, "Fin-and-tube coil constructed of copper, tubes and
copper fins." Copper fins are usually not specified on indoor unit heaters. Is this needed? If so, will a phenolic coating be an acceptable substitute? Response: The specification is correct.
We prefer copper tubes and copper fins. |