AWARDED PROJECT
| Project Title: | RENOVATE AND RELOCATE WAREHOUSE SPACE |
| Project Location: | MCAS CHERRY POINT, NC |
| Contract Number / Project No.: | N40085-07-D-1908/0120 #361 CCD=28 DAYS STARTING 10/05/09 COMPLETE 11/02/09 LD'S $200/DAY |
| Program: | GMACC |
| DRAWINGS: | PLANROOM/361-WAREHOUSE -RENOVATION- CP/Drawings 20752F-1thru5.pdf |
| SCOPE OF WORK: | PLANROOM/361-WAREHOUSE -RENOVATION- CP/SCOPE OF WORK .PDF |
| ANSWERED RFI: | PLANROOM/361-WAREHOUSE -RENOVATION- CP/ANSWERED RFI01 .pdf |
| ANSWERED RFI: | PLANROOM/361-WAREHOUSE -RENOVATION- CP/ANSWERED RFI02 .pdf |
| ANSWERED RFI: | PLANROOM/361-WAREHOUSE -RENOVATION- CP/ANSWERED RFI04 .pdf |
| ANSWERED RFI: |
1. Please provide location, material, & line size of existing
domestic cold water piping. Answer -
Assume that a 3/4" cold water line is available at the existing
restroom location. 2. Please provide location & line size of existing sanitary sewer lines. Answer - Assume that a 4" sanitary sewer line exists at the existing restroom location. 3. Please provide location of existing hot water heater. Answer - Install new 4 gallon point of use hot water heater at new restroom. 4. If available, please provide as-built drawings for new warehouse lease space. Answer - None available. 5. Please provide details of warehouse lease space concrete floor. Answer - Assume 6" 4,000 PSI concrete floor slab. 6. Please provide location of existing power panels and available circuits for new HVAC unit wiring. Answer - Assume 480vac, 3 phase incoming service at exterior wall where zones 3 and 5 intersect. |
| ANSWERED RFI: |
Question1. What documents will be required for the design of the climate
controlled system in area 3? What is the space going to be used for, i.e.
will there be any type of heat producing equipment in the space. Answer
- Load Calculations as required by ASHRAE current edition. No
heat but existing lighting. Question 2. Will the government require any design documents for the plumbing system to serve the unisex restroom restroom? Provide design drawing for new restroom for information. Answer - Restroom shall comply with current
NC Building codes and ADA requirements. |
| ANSWERED RFI: |
Question 1. C & H Distributors indicated
that it will take up to 4 weeks to have the shelving referenced in the RFI
dated 9/17/2009, Answered Question #4 delivered to the new site. This delay
will potentially extend the project past the 28 Day project duration. How
would you like us to proceed? Answer - Proceed
with procurement of shelving. Store equipment on the floor surface on
pallets. If shelves do not arrive prior to the 28 days, then install
the shelving after the 28 days and relocate pallets of equipment to the
shelves. Question 2. Does the new shelving referenced in the RFI dated 9/17/2009, Answered Question 4 and Sheet 5 of 5 consist of one continuous run of seven bays or seven individual stand alone bays? Answer - The shelving shall be one continuous run of seven bays consisting of three shelves high for storage. Question 3. What type of wall bracing will be required for the 2" x 4" x 8' wood stud walls referenced in 3.3.1.1 of the scope of work? Answer - Wall bracing shall meet NC Building codes. |
| ANSWERED RFI: |
Question1)
How many Tel/Com ports to be installed in each of the offices? ANSWER: 2 voice / 2 data Question 2) Where is the TTB/Cabinet intended to be located? ANSWER: On the proposed separation wall in vicinity of loading dock. Question 3) Where does the existing outside plant tel/com enter the new building? ANSWER: Unknown. Question 4) Is there any outside warehouse tel/com scope? ANSWER: No |
These files are in Adobe Acrobat PDF format.