AWARDED PROJECT
| Project Title: | Install New Mixers in Wet Wells RAS/WAS B4376 |
| Project Location: | MCAS CHERRY POINT, NC |
| Contract Number: / Project No.: | N40085-07-D-1908/101 WR4656615 #309 |
| Program: | GMACC CCD = 02 NOVEMBER 2009 |
| DRAWINGS: | NONE |
| SCOPE OF WORK: | PLANROOM/309 NEW MIXERS IN WET WELLS B4379 CP/SCOPE B4376 Install New Mixers.pdf |
| ANSWERED RFI: | |
|
QUESTION: Who is
responsible for the removal & disposal of the sludge?
ANSWER: Contractor is responsible for the
pumping of Sludge, But there is a Flanging Station available for direct ANSWER: 5 feet from top of sludge to grate. |
|
| ANSWERED RFI: |
QUESTION: Clean water is usually required for
testing of equipment. If this is required, is there a source of water available to fill the tank and what is the source (i.e. Hydrant)? After testing can the clean water flow into the system or will it have to be pumped out? ANSWER: There is a fire hydrant within 100 feet of work site |
These files are in Adobe Acrobat PDF format.