AWARDED PROJECT


Project Title:   Install New Mixers in Wet Wells RAS/WAS B4376
Project Location:   MCAS CHERRY POINT, NC
Contract Number: / Project No.:   N40085-07-D-1908/101  WR4656615 #309
Program:   GMACC      CCD = 02 NOVEMBER 2009

DRAWINGS: NONE
SCOPE OF WORK: PLANROOM/309 NEW MIXERS IN WET WELLS B4379 CP/SCOPE B4376 Install New Mixers.pdf
ANSWERED RFI:
QUESTION: Who is responsible for the removal & disposal of the sludge?

ANSWER: Contractor is responsible for the pumping of Sludge, But there is a Flanging Station available for direct
pumping in the basement of complex.

QUESTION: What is the invert elevation of the sludge well (How deep from the
top grated surface)?

ANSWER: 5 feet from top of sludge to grate.

ANSWERED RFI: QUESTION: Clean water is usually required for testing of equipment.  If this is required, is there a source of water
available to fill the tank and what is the source (i.e. Hydrant)? After testing can the clean water flow into the system
or will it have to be pumped out?
ANSWER: There is a fire hydrant within 100 feet of work site
  