AWARDED PROJECT
| Project Title: | INSTALL MODULAR BUILDINGS AT ONSLOW BEACH, PHASE III |
| Project Location: | MCB CAMP LEJEUNE, NC |
| Contract Number / Project No.: | N40085-07-D-1908/0074 080187 #230
CCD 60 DAYS = 12/16/08 |
| Program: | GMACC |
| DRAWINGS 1 OF 2: | PLANROOM/230 INSTALL MODULARS AT ONSLOW BEACH PHASE III/Drawings1_080187.pdf |
| DRAWINGS 2 OF 2: | PLANROOM/230 INSTALL MODULARS AT ONSLOW BEACH PHASE III/Drawings2_080187.pdf |
| SPECIFICATIONS: | PLANROOM/230 INSTALL MODULARS AT ONSLOW BEACH PHASE III/Specs_080187.pdf |
| AMENDMENT 0001 ANSWERED RFI: | PLANROOM/230 INSTALL MODULARS AT ONSLOW BEACH PHASE III/Amend 0001 080187 (1).pdf |
| AMENDMENT 0002 ANSWERED RFI: | PLANROOM/230 INSTALL MODULARS AT ONSLOW BEACH PHASE III/Amend 0002 080187.pdf |
These files are in Adobe Acrobat PDF format.